Industrial Projects
Industrial
Precision-Built Industrial Projects Backed by Decades of Experience. Projects.
Many of our industrial clients have significant “in house” capabilities to handle routine repair and rehabilitation projects. However, when a project’s size or complexity demands additional resources, Fairbanks Mill is ready to assist. FM has been involved with several major projects at EHV-Weidmann Industries, Fairbanks Scales, Burke Lumber, and several paper mills in the region.
Commercial Electrical Services
Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
Residental Electrical Services
Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
Industrial Systems
We Work On
Industrial
Machine Foundations- New Board Cutter
This very complex industrial machine project required a series of reinforced concrete foundations to be completed within a very tight schedule. Fairbanks Mill committed to the job and then proceeded to deliver the project in the six week time slot, with two days to spare. As the machine was manufactured in Austria, all project layout and sizing dimensions were metric.
Reinforced Concrete Tank Vault- Fuel Oil Tank Vault
Conversion from No. 2 to No. 4 fuel oil represented significant financial benefit to the owner but could not be accomplished until this new tank / vault system were completed. Fairbanks Mill used its computerized scheduling software to plan out the entire project and identify the “critical path” activities. Once identified, the critical items, which included structural design, rebar fabrication, and tank procurement, were given special priority.
Switchyard Foundations- Capacitor Foundation
Fairbanks Mill was selected to install the concrete foundations for a new capacitor assembly at this 20 megawatt wood chip facility. Safety was paramount as this work was performed within the existing high voltage switchyard. In order to minimize downtime, the concrete formwork and reinforcing steel cages were prefabricated at the FM shop. At the site, these prefabricated assemblies were set using a small excavator.
Powerhouse
Fairbanks Mill has been involved in several “ground up” powerhouse construction projects. However, there more often exists a need to adapt an existing facility to new generating...
Dams
Although construction of new dams is obviously limited in today’s world, many existing dams require repairs, upgrades, and modifications. Fairbanks Mill has provided many...
Intake
Intake projects include trashracks, head gates, trash rakes, and trash “blasters”. When ever possible, the opinions of the plant operator should be adequately considered...
Penstock
Fairbanks Mill has worked on a wide range of penstock sizes and materials, from 12 inch diameter plastic up to a 15 foot diameter steel monster. Vertical, horizontal,
Turbine Generator
Whether you consider installation of new equipment, repairs to old equipment, or a total refurbishment project, Fairbanks Mill has the experience to get the job done.
Tailrace
In response to the needs of our clients to cost effectively maintain their aging plants, Fairbanks Mill has developed several innovative techniques for the “in the wet” repairs
Regulatory Enhancements
Like it or not, today’s tightly regulated environment has resulted in many enhancement projects including fish passages, minimum flow release structures...
Ready to Build With Confidence?
Partner with Fairbanks Mill for safe, efficient, and expert construction — from
hydroelectric systems to complex infrastructure projects.
TESTIMONIAL
Trusted by Clients.
Proven in the Field.
See what our partners and clients say about working with Fairbanks Mill on critical construction and infrastructure projects.
Fairbanks Mill handled our hydro upgrade with exceptional precision and professionalism. From day one, their crew demonstrated deep industry knowledge and adaptability — solving unforeseen issues quickly and effectively. Thanks to their proactive approach, we stayed ahead of schedule and under budget.
Fairbanks Mill handled our hydro upgrade with exceptional precision and professionalism. From day one, their crew demonstrated deep industry knowledge and adaptability — solving unforeseen issues quickly and effectively. Thanks to their proactive approach, we stayed ahead of schedule and under budget.
Fairbanks Mill handled our hydro upgrade with exceptional precision and professionalism. From day one, their crew demonstrated deep industry knowledge and adaptability — solving unforeseen issues quickly and effectively. Thanks to their proactive approach, we stayed ahead of schedule and under budget.
Latest News Insights
BLOG






